Work resumes at Terrington St John


Work has resumed at Terrington St John

Tim and Chris collected 3 RSJ’s and a staircase

The RSJ’s were positioned under the keel for more stability

Myself Chris and Ron erected the staircase using scaffold poles which has made it very secure with the addition of handrails for extra safety